Actions
Feature #45
closedDistributed Traceability
Start date:
03/03/2024
Due date:
03/05/2024
% Done:
100%
Estimated time:
(Total: 2:00 h)
Spent time:
(Total: 2:00 h)
Description
One more specification shall be created with the references to the ARCH document. Since the references from SRS to ARCH already exist, it will create the case with two specifications references to higher level specification, that is actually OK.
For such cases the Distributed Traceability matrix can be produced.
Actions