Project

General

Profile

Actions

Feature #45

closed

Distributed Traceability

Added by Oleksandr Ivanov 10 months ago. Updated 10 months ago.

Status:
Closed
Priority:
Normal
Target version:
Start date:
03/03/2024
Due date:
03/05/2024
% Done:

100%

Estimated time:
(Total: 2:00 h)
Spent time:
(Total: 2:00 h)

Description

One more specification shall be created with the references to the ARCH document. Since the references from SRS to ARCH already exist, it will create the case with two specifications references to higher level specification, that is actually OK.

For such cases the Distributed Traceability matrix can be produced.


Subtasks 1 (0 open1 closed)

DocTask #46: Create Requirements for External Components specificationClosedOleksandr Ivanov03/03/202403/05/2024

Actions
Actions

Also available in: Atom PDF