Actions
Feature #3
closedSpecifications Traceability
Start date:
01/16/2024
Due date:
02/05/2024
% Done:
100%
Estimated time:
(Total: 24:00 h)
Spent time:
(Total: 13:00 h)
Description
The system shall allow to establish a traceability between specifications.
During the audit it should be clear how particular item of a high-level specification was implemented/decomposed in/to the elements of low-level specification.
For example,
- a single system requirement should have traces to software requirements (one or many)
- a single software requirement should have traces to software architecture items (one or many)
etc.
Actions