Documents  Decision Records  Risks ADR-001: Start Project Decision

ADR-001: Start Project Decision

1 Status

Date Status
07-07-2026 Proposed

2 Context

This is an example decision record. It demonstrates how Almirah captures a

decision and links it to the requirements it affects.

3 Decision

Describe the decision here. The leading "*" in the Status table marks the

current state of the record.

4 Scope

# Item Owner Depends On Est (focused) Est (safe) Status Start Date Target Date Description
1 Requirements BA 2 3 To Do
2 Code DEV 3 5 To Do
3 Tests TEST 2 4 To Do

5 Out of Scope

The ADR contains the most important sections with no detailed content.

6 Consequences

6.1 Positive

An ADR example will clearly show the approach Almirah framework use for any software changes.

6.2 Negative

The format of this ADR can be different that is required for the real project.

6.3 Neutral

TBD

7 Alternatives Considered

8 Affected Documents

Table below shows a requirement whose text this decision creates or updates.

# Proposed Text Req-ID
1 This is a first requirement (controlled paragraph with ID equal to "REQ-001"). REQ-001

9 Software Versions

Software Version Category Software Version ID
Latest Released Version n/a
Issue Found in Version n/a
Target Release Version 0.0.1

10 References

TBD

11 Review Evidences

TBD